Open Timesheet in the sidebar. Choose Daily, Weekly or Monthly at the top right. Each view shows one card per person.
Daily
One day at a time. Use the arrows beside the date to move a day back or forward, or click the date to pick one. The card shows:
- the day's totals and the time on each project;
- a bar of the day's hours against the hours required;
- the Activity Timeline, a 24-hour strip with a block for each entry. Tracked, Manual and Overtime blocks each have their own colour. Point at a block to see its project, times and duration;
- a link such as Show 3 time entries. It lists each entry with its times, duration, project and task. Manual entries carry a Manual label and their reason.
To change an entry, see Edit, split or delete a time entry.
Weekly and Monthly
Weekly shows a week as a bar chart, with the week's totals beside it. It opens on the current week, Sunday to Saturday. To see another week, click the date box, then the day the week should start on. Monthly does the same for a month: choose the year and the month.
Each day's bar stacks tracked, manual and overtime hours, with the hours still required on top. Point at a bar to see that day's numbers.
What the totals mean
- Tracked Time: time from the desktop app.
- Manual Time: time added by hand. It shows only when there is some.
- Total Time: tracked and manual time together.
- Idle Time, if shown: idle time that was kept. It is already part of Tracked Time, not extra.
- Required Time: your organization's Default work hours per day, times the working days in the period.
- Remaining Time: how much of the required time is still to do.
- Overtime: total time minus required time, never below zero. The weekly and monthly views call it Weekly Overtime and Monthly Overtime.
How overtime is worked out
Overtime is counted over the whole period, not day by day. A 10-hour day and a 6-hour day in the same week cancel out.
For example, a five-day week at 8 hours a day requires 40 hours. A total of 43 hours gives 3 hours of overtime. A total of 38 hours gives none.
A day outside your organization's working days requires nothing, so all the time you work on it counts towards overtime. The question mark next to the overtime figure shows the formula in the app.
Whose timesheet you see
You see your own card. If your role covers other people's time, use All Members to choose whose cards to show. Tick Show past members to include people who have left. All Projects narrows the hours to the projects you pick.
Hours missing or not what you expected? See Why your hours don't look right.